Toggle navigation
LOGIN
TAMU
Jadwal Pemeriksaan
Pemantauan Proses
KIM
Standar Volume 1
Data Mobil Tangki
Dokumen
KIM
Vapor
SKIOM
STNK
KEUR DLLAJ
Tera Metrologi
Random Check
Laporan Evaluasi KIM
Terlambat Perpanjangan
Durasi
Akun
Awak Mobil Tangki
Home
Detail Mobil Tangki
Detail B9863SEI
NO POLISI
B9863SEI
MASA BERLAKU
12 September 2026
NOMOR TERA
510/603 UAPV/SKHP/416-119.1/2024
Dokumen
Lihat
Lihat
KONFIGURASI
8-8-8-8
KOMPARTEMEN 1
T1 (mm)
T2 (mm)
KEPEKAAN (L)
RUANG KOSONG
190
1635
0.28
320
KOMPARTEMEN 2
T1 (mm)
T2 (mm)
KEPEKAAN (L)
RUANG KOSONG
198.7
1633
0.28
354
KOMPARTEMEN 3
T1 (mm)
T2 (mm)
KEPEKAAN (L)
RUANG KOSONG
195.5
1635
0.285
344
KOMPARTEMEN 4
T1 (mm)
T2 (mm)
KEPEKAAN (L)
RUANG KOSONG
205.5
1635
0.295
346
© Copyright Terminal BBM Jakarta Group 2018. All Right Reserved